For spaces that last longer and look better...
Support 24/7

Değirmiçem Mah. Abdullah Çolakoğlu Cad.
Kevser Apt. No:5A Şehitkamil/Gaziantep

Adıyaman, with a largely textile industrial zone and a growing food sector, is one of the region's production centres. About 150 km from our base in Gaziantep, we install epoxy and polyurethane flooring, line marking and concrete surface work in its factories, warehouses, workshops and sports facilities — including the flooring for plants rebuilt after the earthquake.
Distance: About 150 km from central Gaziantep. We do not charge travel for the survey, and our crew stays on site for the duration of the works.
Areas we cover in Adıyaman: Adıyaman city centre, Kâhta, Besni, Gölbaşı, Çelikhan, Sincik, Tut, Samsat, Gerger and the Adıyaman Organised Industrial Zone.
In production halls with a fixed machine layout we lay a dust-free epoxy coating and mark out the lines and walkways to match.
For a washable, seamless, hygienic surface we recommend self-levelling epoxy or polyurethane concrete.
A mortar system for forklift traffic; Ucrete in cold areas.
Acrylic court surfacing, rubber tile sports hall flooring and children's play area surfaces.
Thin, dust-free coating for warehouses, workshops and lightly trafficked areas.
Seamless, smooth, hygienic surface for food and pharmaceutical production.
Slip-resistant multilayer system with high abrasion resistance.
ESD floor that earths static charge, for electronics manufacturing.
The highest mechanical strength available, for heavy forklift traffic.
Flexible, UV-stable, crack-bridging coating.
Polyurethane concrete: resistant to hot water and chemicals.
Multi-coat acrylic court surfacing, with line marking.
Surfacing for indoor and outdoor volleyball courts.
Acrylic tennis court surfacing, in the court speed you specify.
Shock-absorbing flooring for sports halls and gyms.
Walkway, hazard zone and equipment area markings.
Bay, arrow and accessible parking markings.
In-plant route and junction markings.
A bright, low-maintenance concrete floor that needs no coating.
Patterned concrete for gardens, car parks and landscaping.
For a free site survey and quotation in Adıyaman, call 0507 597 9537 or use the contact form to reach us.
The questions we are asked most about Epoxy Flooring in Adıyaman, answered by our technical team. If something here does not cover your case, call us on 0507 597 9537.
Our crew travels to Adıyaman and stays on site until the work is finished. An epoxy floor of 500–1,000 m² is completed in four to six days including surface preparation.
The concrete must cure for at least 28 days and read below 4 % moisture. A coating applied too early blisters and lifts under the vapour pressure leaving the slab. We take a moisture reading during the survey and set the date together.
Yes, we serve every district of Adıyaman and charge no additional travel fee for the outlying ones.
Normally a deposit at the start and the balance on completion. On corporate projects the invoicing and payment schedule follow the project contract.
HBK Epoxy Flooring works from its base in Şehitkamil, Gaziantep and covers eight provinces across southern Türkiye. Our crews can travel for a survey the same day: in Adıyaman and the surrounding area we measure factory, warehouse, car park, sports hall and outdoor court projects on site and prepare a free quotation.
Districts and industrial zones we cover in Gaziantep: Şehitkamil, Şahinbey, Oğuzeli, Nizip, İslahiye, Nurdağı, Gaziantep OIZ 1, Gaziantep OIZ 2, Gaziantep OIZ 3, Gaziantep OIZ 4, Gaziantep OIZ 5, Başpınar OIZ.
For a free site survey and quotation: 0507 597 9537 · WhatsApp · Contact form