Reinforced with a glass and carbon filler blend, the Epoxy Coating System reaches a very high level of mechanical strength — the same resin technology is used in aerospace and marine work. On floors it is applied over concrete and steel. Because it cleans easily and does not hold dust, it is also a common choice on construction projects.
Its resistance to chemical and physical attack suits it to industrial floors of every kind — pharmaceutical and chemical plants, hospitals, power stations, textile mills, plastics production, the automotive sector and warehousing — in a full range of colours.
Nothing goes down until the slab has been ground back. Worn or damaged surface material is not strong enough to carry an epoxy system, so it is removed and the floor levelled — and sound concrete is ground too, because the point of the operation is to open up the surface. That roughened profile is what lets the epoxy key permanently into the concrete. Everything that would interfere with adhesion is then taken off: dust, oil and any other contaminant. The oil films that build up over years of production matter most. Where a greasy residue is left in place, the coating cannot bond properly, and a floor that has not bonded will lift, break up or crack later on.
Epoxy has limited UV stability, so it belongs indoors — outdoors, polyurethane is the correct choice. It is also a rigid material and should not be applied over a flexible substrate.
Applied at 0.2–1.0 mm.
Applied at 1.5–4.0 mm.
Applied at 0.3–0.6 mm.
Applied at 1–3 mm.
Applied at 0.8 mm and above.
Applied at 0.8–2.0 mm.
The questions we are asked most about Epoxy Coating System, answered by our technical team. If something here does not cover your case, call us on 0507 597 9537.
With proper surface preparation and the right system, an epoxy floor lasts 8–15 years in industrial use. Three things decide its life: the soundness of the existing concrete, the thickness of the system chosen and the intensity of forklift and load traffic it carries.
Price depends on the area in square metres, the system chosen (coating, self-levelling, multilayer, antistatic, mortar), the film thickness and the condition of the existing slab. Grinding, repair and priming are added where the substrate needs them. HBK carries out free site surveys across the eight provinces we serve.
Foot traffic is allowed roughly 24 hours after application. Full mechanical and chemical resistance needs seven days of cure, and heavy loads or chemical contact should be kept off the floor until then.
Choose epoxy for enclosed areas where heavy mechanical load and chemical resistance come first. Choose polyurethane for outdoor areas, UV exposure, thermal shock or where the slab is likely to move and crack. Food plants washed down with hot water need Ucrete polyurethane concrete.
HBK Epoxy Flooring works from its base in Şehitkamil, Gaziantep and covers eight provinces across southern Türkiye. Our crews can travel for a survey the same day: in Gaziantep and the surrounding area we measure factory, warehouse, car park, sports hall and outdoor court projects on site and prepare a free quotation.
Districts and industrial zones we cover in Gaziantep: Şehitkamil, Şahinbey, Oğuzeli, Nizip, İslahiye, Nurdağı, Gaziantep OIZ 1, Gaziantep OIZ 2, Gaziantep OIZ 3, Gaziantep OIZ 4, Gaziantep OIZ 5, Başpınar OIZ.
For a free site survey and quotation: 0507 597 9537 · WhatsApp · Contact form