Warranty scope matters as much as its length. A workmanship defect and damage from misuse are different things; separating them in writing from the start protects both sides.
What a warranty protects
Workmanship or material defects such as loss of adhesion, lifting and blistering are usually covered. The warranty should state clearly the area, period and conditions of use it covers; where a facility has several systems, each is covered separately.
What is excluded
Heavy impact, dragging sharp objects, chemicals other than those specified, fire and normal wear are outside most warranties. To avoid disputes over chemical exposure, the list of liquids used on site is given at quotation stage and the system is chosen to suit it (chemical resistance chart).
Product assurance and workmanship warranty
The assurance a manufacturer gives for its product and the warranty a contractor gives for workmanship are different things. Product data sheets state that technical data are based on laboratory tests and that actual measured values may vary due to circumstances beyond the manufacturer's control. The document should therefore state clearly which assurance comes from the manufacturer and which from the contractor.
Substrate problems
Movement in the concrete, structural cracks or moisture that appears later can affect the coating. The Turkish Code of Obligations also gives the contractor a duty here: if it becomes clear during the work that the site provided by the client is defective, the contractor must report this immediately, and is otherwise liable for the consequences (Art. 472).
Survey records
The condition of the floor is therefore measured and recorded at survey stage: moisture readings, a map of cracks and damage and, where needed, a pull-off test. These records become part of the warranty file and make it easier to understand the cause of any later defect (concrete moisture testing, joint and crack repair, damaged concrete floors).
Installation log
During installation, air and surface temperature, relative humidity, dew point and the batch numbers of the materials used are recorded; product data sheets require these measurements anyway. The log shows that the work was carried out in line with the data sheet. Backed by photographs, it is the most reliable document for both sides in a dispute.
Maintenance conditions
Following the recommended cleaning and maintenance may be required for the warranty to apply. Product data sheets refer to the manufacturer's cleaning instructions for maintenance, and these should be handed over in writing. We explain what to watch for in the first weeks in the first 30 days after coating.
Handover and inspection
Under the Code, after the work is handed over the client must inspect it as soon as the normal course of business allows and report any defects to the contractor within a reasonable time; either party may, at its own expense, request an inspection and report by an expert (Art. 474). A joint check at handover and a signed record document this step.
Defects that appear later
The Code states that once the work has been accepted, expressly or tacitly, the contractor is released from liability, except for defects it deliberately concealed and those that could not be detected in a proper inspection; a defect that appears later must also be reported without delay (Art. 477). The report is made in writing, with the location and a photograph of the defect.
Rights and time limits in the Code
For defects the contractor is responsible for, the client may, depending on the circumstances, withdraw from the contract, ask for a price reduction or, where it does not involve excessive cost, ask for free repair; the right to compensation is reserved (Art. 475). The limitation period for claims runs from handover: two years for works other than immovable structures, five years for immovable structures and twenty years in cases of gross fault (Art. 478). A lawyer should be consulted on any specific case.
A warranty period is not a lifespan
The warranty period does not show how long the floor will last, but for how long cover is given against certain defects. Lifespan depends on traffic intensity, system thickness and maintenance (how long an epoxy floor lasts).
Put it in writing
The warranty period, coverage, exclusions and claims procedure should be stated clearly in the quote or contract. Other questions to ask when comparing quotes are in 10 questions to ask before a quote.
Frequently Asked Questions
What does a flooring warranty cover?
Usually workmanship or material defects such as loss of adhesion, lifting and blistering; the area, period and conditions of use covered are stated in writing.
Is impact damage covered?
Usually not; heavy impact, dragging sharp objects and effects outside the specified use are excluded.
How should the warranty be written?
Period, coverage, exclusions, maintenance conditions and claims procedure should be stated clearly in the quote or contract.
How is a defect noticed after handover reported?
Without delay and in writing, with its location and a photograph. The Turkish Code of Obligations requires inspection and notice after handover (Art. 474) and notice without delay for defects that appear later (Art. 477).
Would you like a site survey for your floor? HBK Epoxy Flooring, based in Gaziantep, offers free surveys and quotations in the surrounding provinces.
0507 597 9537 WhatsAppRelated articles

Bike Lane Width and Coloured Surfacing: What Are the Rules?
In the figures of Turkey's Bicycle Paths Regulation a one-way cycle lane and a separated cycle path are 130 cm wide, and a two-way rural cycle band is 230 cm. Junction crossings are painted in non-slip blue; if the rest of the path is painted, the colour is again blue.
Read article ›
Epoxy Coverage: How Many m² Does 20 kg of Epoxy Cover?
How far epoxy goes depends not on the weight of the kit but on the thickness of the layer and the density of the product; the calculation takes minutes.
Read article ›
Flooring Without Stopping Production: Planning a Phased Installation
Renewing a factory floor does not have to halt production for weeks. Dividing the area into phases and choosing fast-curing systems lets the work finish while operations continue.
Read article ›